Operation 72 takes no operand #616

Manually merged
binjovi-bot merged 1 commit from rpg-9-h-op72-20261023 into trunk 2026-10-23 05:36:05 +00:00
Owner

Operation 72 takes no operand

  • ile_crtdata.zig: operation 72 has no operand. Before, an object with
    %CHECK or %CHECKR of a field set (not a literal) did not read at all.
    Found by the dictionary battery strvar of the loop tooling, bisected to
    the two forms; the count is the one reading that leaves the operations
    after it well formed (72; 27 ..; 27 ..; 62). Public twins h-check-var
    and h-checkr-var (new probes). The statements themselves stay
    unresolved (the semantics of 72 is not measured yet).

Gates

{"checks":{"net_statements":0},"census":{"statuses":{"recovered":645,"partial":0,"unresolved":0},"regressions":0,"newly_recovered":0},"emit":{"worse":[],"better":0,"newly_clean":0,"clean_delta":0,"base":203,"new":203},"twins":{"groups":413,"recovered":400,"regressions":[],"newly":2},"allgroups":{"regressions":[],"newly":[],"worse":[]},"full_check":{"exit":0,"seconds":713}}
# Operation 72 takes no operand - `ile_crtdata.zig`: operation 72 has no operand. Before, an object with `%CHECK` or `%CHECKR` of a field set (not a literal) did not read at all. Found by the dictionary battery `strvar` of the loop tooling, bisected to the two forms; the count is the one reading that leaves the operations after it well formed (`72; 27 ..; 27 ..; 62`). Public twins `h-check-var` and `h-checkr-var` (new probes). The statements themselves stay unresolved (the semantics of 72 is not measured yet). ## Gates ``` {"checks":{"net_statements":0},"census":{"statuses":{"recovered":645,"partial":0,"unresolved":0},"regressions":0,"newly_recovered":0},"emit":{"worse":[],"better":0,"newly_clean":0,"clean_delta":0,"base":203,"new":203},"twins":{"groups":413,"recovered":400,"regressions":[],"newly":2},"allgroups":{"regressions":[],"newly":[],"worse":[]},"full_check":{"exit":0,"seconds":713}} ```
Operation 72 takes no operand
All checks were successful
binjovi/ci Binjovi completed the frozen plan
8964e8652c
binjovi-bot manually merged commit 8964e8652c into trunk 2026-10-23 05:36:05 +00:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
sean/sourcerer!616
No description provided.